If you don’t have coal, salt and copper, then how would you
earth your connection temporarily at a camp site.?
Answer Posted / pavan kumar
dig a small hole and take a safety pin and give your
connection to it and close the hole and pour some water.
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
why are installed water leakage detection system data centers & server rooms
how to design the heater in temperature control unit to heat 50KL of water?
what is the voltages using in movie theaters??? why ??why not other??
differnce between single acting and double acting solenoid valves
On what cycle does thermal power plant operate?
What is the meaning of HT Trivector Meter ?
explain Density
Sir, I have applied for the of Assistant.engineer of NPDCL. please send me all AP TRANSCO AND JENCO solved papers of previous exams . I requested send me the papers to my id as soon as possible (rajanikanth_peddi@yahoo.co.in) (This is very urgent) Thank You,
please send me the L&T Emb. sys. placement papers and entire details of pattren
Why is better to have a minimum ceiling voltage of 250% than 160%?
After doubling voltage from solar cells & use step down voltage transformer can we get high current output with low voltage.
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
How to test the Secure Elite 440 Multi function meter working condition.