Answer Posted / sourish
gauge is the initial distance between two predefined
point..example..yielding strength test{while taking the
distance between two points}
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Forces in a Shear Wall are in plane or out of plane ?
What is the difference between absorption & adsorption and sorption?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
what is meant by shear center?????
construction workers how much time take one work or qty
what are the Task work of different labour.?
What is Gsb tollens ?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what is differences between ferrock and concrete ?
What is the absolute pressure scale?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is difference between combin footing & rapt footing
what is the max. area can we apply the plate load test ?
what is Short bored pile foundation.
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in