Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to explian the V model. Diagram not required but iwant the
answer gnerally
No Diagram explanation plzzzzzzzzzz..

Answer Posted / ramyasri

Hai...

Conventional V-Model represents the development process in
the form of a V shape. The right side of the V represents
the testing where the systems is validated against the
specifications defined on the left side. The meeting point
of the V represents the actual development

Business Requirements Acceptance Testing
\ /
SRS SYSTEM TESTING
\ /
HLD INTEGRATION TESTING
\ /
LLD UNIT TESTING
\ /
CODING

The V-model is a graphical representation of the systems
development lifecycle. The V-model is a software
development process which can be presumed to be the
extension of the waterfall model. Instead of moving down in
a linear way, the process steps are bent upwards after the
coding phase, to form the typical V shape. The V-Model
demonstrates the relationships between each phase of the
development life cycle and its associated phase of testing.


The four main process phases – requirements, specification,
design and implementation – have a corresponding
verification and validation testing phase.Implementation of
modules is tested by unit testing, system design is tested
by integration testing, system specifications are tested by
system testing and finally acceptance testing verifies the
requirements.

The V-model gets its name from the timing of the phases.
Starting from the requirements, the system is developed one
phase at a time until the lowest phase, the implementation
phase, is finished. At this stage testing begins, starting
from unit testing and moving up one test level at a time
until the acceptance testing phase is completed.

Thanks & Regards
B.Ramyasri

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can you do the usability testing?

1260


Hi , Please send me the interview questions which were asked in manual testing mainly the test cases asked to write in interview.

2078


1...DIFF BETWEEN QTP AND WIN RUNNER? 2... CHECKPOINTS AND EXPLAIN EACH OF THEM? 3...WHY IS STEP GENERATOR? 4... WHAT IS THE DIFF BETWEEN FUNCTIONS AND SUB ROUTINE?

1985


Please send any one latest 3+ years of experience testing tools resumes my mail id is krishnavenimodaliar26@gmail.com

3393


Describe your personal software development process.

2726


What is actually a rule based testing

2272


What were the major challenges u faced while testing

2584


Information about Automated Software Installer

2035


whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?

1984


Unit Testing can be done by using Nunit?

1242


Write the test cases for godaddy home page

1829


What does entry and exit criteria mean in a project?

1224


can anyone help me in getting unix on manual testing i.e can u forward material & web sites to my mail id (suresh_57599@yahoo.com) to understand how the work flow working on manual testing on unix and the contents.plzzzzzzzz help me its urgent.

1978


How to overcome pesticide paradox?

1222


which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect

2335