Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which one is economical construction brick masonry or sold
block masonry?

Answer Posted / sjtbehera

Yes bricks are lower price than solid blocks and easily
avilable in site. somehow solid blocks are in heavy in
nature and it is difficulty to dismantling. yes some
advantage solid blocks i.e writting Us rao. but speed of
work is lower due to joint of this heavy in nature.

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the service corridor?

2440


what is E VALUE FOR WOOD

2086


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1689


sir, whitch is the best book (writer name) for prepration of gate....

1714


What is meant by autocad?

1319


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

2053


What is packing Factor ?

1495


Is there any course for billing available in Mumbai? If yes then please mail me the details..

2289


What do we mean by partial moment release ??

3966


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1921


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2146


What are some structures that may be subjected to fatigue?

1189


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1670


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2930


What is Critical path in Ms-Project ?

1251