Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED
THAN ORDINARY BITUMINIOUS SURFACING?

Answer Posted / ashok kumar

PMB stands for Polymer modified bitumen & used to cater bad
effect of water for bituminous roads

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1622


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1954


explain the rale of the government in the construction industry

2337


what is the difference between prime coat and tack coat in road construction

4986


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1770


which method is used in semi-rigid connection design??

2207


At what point does a circle start losing area when being flattened?

1055


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5562


What is binding spacing of the rebars at lapping zones.

1223


what is the tensile strength of 10swg and 8swg gabion wire?

1984


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

2118


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1838


Which is the latest version of solidsworks?

1195


what is the mode of method of face bar measurement

2520


What are the RISKS during the project construction?

2210