SRC1 -> EXP -> AGGR ->
TGT
SRC2 -> EXP ->
Above is a maaping with two pipeline connected to the taret
TGT. Design wise is this design is correct or not ?

Answer Posted / dharmendra

Hi, Jeck.Thanks for the answer but could you please explain
me why keeping AGGR in 1st pipeline makes in invalid
mapping.Thanks in advance

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

difference between informatica 8.1.1 and 8.6

3349


Differences between connected and unconnected lookup?

730


Tell me any other tools for scheduling purpose other than workflow manager pmcmd?

879


What is enterprise data warehousing?

695


Explain Dataware house architecture .how data flow from intial to end?

2209






What is rank transformation in informatica

801


how can we find the bottle neck in SQL Query in SOURCE QUALIFIER, and how can we tune it..?

6156


What are the main features of Oracle 8i with context to datawarehouse?

1769


What is Session and Batches?

773


Calculate sum of salaries department wise. Then the sum will be repeat for all columns in each department. Develop a mapping for this.

1959


Is it possible to define a single node as a Gateway node as well as worker node?

763


Design time, run time. If you don't create parameter what will happen

1519


Name at least 5 different types of transformations used in mapping design and state the use of each.?

782


Please let me know how to make Data masking in informatica..

1343


I have a mapping loading 100 records and it failed on 20th record. how to recover it without changing anything.(in prod where we don't have any access).. (the session should should start from 21 record)

1200