If there are some errors in goods movements, and less stock
of material consumed, how can i solve that problem in SAP.
Answer Posted / varun jalota
According to me COGI is basically a SAP standardised system
which will tell you that what is the error in some cases it
can rectify it too.
But if the entry is done manually by MB1A, MB1B, MB1C you
have to bring back or cancell the movement or move the
stock to desired material and then refresh COGI.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How is indian slab and us slab?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What are the basic dates?
Explain Kanban.
Why and how you calculate WIP?
How can you create production order without routing and BoM?
How can you get planned orders scheduled so that you can do capacity leveling ?
What is the difference between indian and us payroll?
What is Individual and collective requirements and differecne between them in MTO scenario?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
What is the production process in sap?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is a ‘bom’?
Explain why there is need of production version?