Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how does capacitor oppose sudden chane in voltage?
how does inductor oppose sudden change in current?

Answer Posted / ganesh.k

initially capacitor behaves like a short circuit so even though v apply voltage across capacitor the vltg across it is zero due 2 short ckt condition, whereas the inductor initially acts as a open ckt so it oppose any sudden chage in current

Is This Answer Correct ?    8 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please brief what is sinewave

2196


Phase control and integral control are used for?

2391


direction of tarbine& genrator

2133


HOW CAN I GET 5CORE HO7 CABLE SIZE IF I HAVE 1800A?

2086


In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

2071


what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?

8038


WHAT IS MEANING OF Gg & Gg IN hrc FUSE

3340


What is transmittance?

1172


how to check ac servo motor

2330


why do we use 25kv supply for traction purpose?

1967


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2295


What fomula is used to calculate: 1. rated frequency withstand voltage, and 2. rated lightning impulse withstand voltage.

1768


What are the causes of unbalanced current on 34.5kv feeder Ia=0.05,Ib= 0.25, Ic=0.15 and In=0.27 prior to tripping current are balance?

1796


Percentage losses in power generation?

3043


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7770