2.3.4.15.12
3.4.5.28.20
4.5.6.45.30
5.6.7.66.42
6.7.8.??.56
Answer Posted / vishal pitaliya
(2+3)*3=15 3*4=12
(3+4)*4=28 4*5=20
(4+5)*5=45 5*6=30
(5+6)*6=66 6*7=42
(6+7)*7=91 7*8=56
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
A fold density is 19 times greater than the water and for copper it is 9 times.At what ratio you can mix gold and copper to get 15 times denser than water.
Dinesh is seated 7 from the left and satish is seated 12 from the right. when they interchange their positions, dinesh is seated 22nd from the left. How many people are there?
If x and x+10 are lengths containing right angle, what is the equation if area is 24 sq.cm
Radha, Geeta & Revathi went for a picnic.After a few days they forgot the date,day and month on which they went to picnic.Radha said that it was on Thursday,May 8 and Geeta said that it was Thursday May 10.Revathi said Friday June 8.Now one of them told all things wrongly,others one thing wrong and the last two things wrongly.If April 1st is tuesday what is the right day,date and month?
A hotel has 10 storeys. Which floor is above the floor below the floor, below the floor above the floor, below the floor above the fifth.
Adam stands facing towards northwest direction.He walks 61 m and then turns southwards and walks another 60 m. How far is he from the starting point.?
Find the next series of 1,2,2,4,8,?
Time and speed time and work boat and streams
What number should be added to or subtracted from each term of the ratio 17 : 24 so that it becomes equal to 1 : 2.
One person meet his friend on 12:30 then on 1:20 on second day, on third day -----?
A fuel dealer mixes two brands of fuel which cost in the ratio 2:3 A solution of 30% Brand A with Brand B yields profit of 10% when sold at RS 297. What is cost of brand B?
Choose the odd man out from the below mentioned options?
any body send me the sample paper for pnb dy.managers,to ravitejareddy.r@gmail.com
which of the following leaders was not among the moderates
A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?