Even when a particular generator in a generating station is
under maintenance we are still able to maintain the same
power output. How is this possible? Does the tie line
between 2 generating stations have a role to play in it?
Answer Posted / sudheer868
It must be noted that installed capacity of a power plant
is always designed to be greater than the load demand.Hence
if any repair or maintaince remaining all are in operation.
If no reserve capacity of plant then tie line has a role to
play.Tie line is line connecting two generating station
buses.Hence required power in one plant is obtained from
reseve capacity of other plant.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
Draw the line diagram of diffretial relay connected to transformer?
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
explain the function of brush less dc motor?
State thevenintheorem?
How to do stting of vl250 siemens MCCB
can we install HT panel & LT panel side by side or how much clearance is required ?
why is the conservator tank painted white on the transformer
What is distance between electrical panel to land ?
diameter of cable and core is doubled then the value of capacitance is
whats the differece between Exd and Exe
thyristor controlled APFC panel design parameter?
what are the specifications we must look at to select a relay for any capacity motor?
What are the advantages of vscf wind electrical system?
As we know induction squirrel cage motor torque Directly praprortinal to applied voltage in star connection & delta also. If I connect 55KW Motor to DOL starter in load condition does motor withstand the load & what will be the current withdrawn ? motor will not fail ?
please tell me when we start motor without load in star or delta connection whose current above condition,pl write formula