Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Are generator action and motor action relates to a
particular machine only?

Answer Posted / sudheer

the above said answer is correct and brief explanation is:
IN motor generating action takes place and the generated
emf is what we call as bacf emf which is opposite to given
supply.Even though it is opposite it is advantageous as it
makes motor self governing that is if load increases speed
decreases back emf decreases and load increases to satisfy
load demand same way it decreases load current if load
decreases.

In generator motoring action takes place and torque
produced is called electromagnetic torque which is in
opposite direction to rotation of prime mover.But we rotate
prime mover with speed greater than electromagnetic torque
hence motoring action takes place predominantly.

AUTHOR:sudheer.868@gmail.com

Is This Answer Correct ?    12 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the numerical quantity of sqcm?

2015


if we give 60 hz single phase supply to the transformer used in europe , than what will happen

1932


What is minimum permicible value of leackage current for LT Panle when applying voltage up to 3 KV for 5 Minuits?

2233


What is the necessary and sufficient condition for stability.

1122


Name the test signals used in control system

1284


Keywords: Die, Card, Coin, B/N 2 To 12

1275


how to design coil turns ?

1960


I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?

1673


can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)

1988


1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?

2060


Which do you think is the most significant cause of energy loss in a factory?

2235


in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.

2688


what is meant by vector group of a transformer? How can it be derived?

1995


what is saturation kit?which use above 15 kw motors panel side.

4187


i need some project topics along with circuit diagram in the electrical adnd electronics engg and also give ome website regarding projects.my mail id is thenmozhi2k7@gmail.com .please help me.

1953