We have a requirement for a project. The project is not yet
started. So, what are the possible testing criterias the
requirement have to fulfil so that we can take up the
proposal to developing the application?
Answer Posted / yogesh
Actually system analyst first conduct the feasibilty study
for:
1] Technical
2] Economically possible
3] Legally possible,
etc
If it is oked then form the proposal. So, you can have the
reviews on the proposal till final baseline document.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Write down the differences between the responsibilities of qa and programmers?
what documnets qa engineer need for starting qa?
Hi Friends, I have 2.5 yrs of experience. i am havung interview for QA/QC position tomorrow.what type of questions shall i expect for this experience? PLS HELP. THANKS IN ADVANCE
What would you do if you have a large suite to execute in very less time?
Define Quality testing ?
What is the difference between Test cases document and test cases design document?
wht type of intersting things sqa have or what is intersting abt sqa and how it will be advanategous for us as a sqa engineer?
-What do you think about unit testing? -How do you assure quality of the code you release? -How do you release software?
How does the Internal QA Audit relates with the ISO Standards level ?
What is software process?
What is bug?
Diffrence b/w compiled module and shared repository?
how we apply cmmi and iso in oyr testing or qa do it have some specifuc format
What is change request?
How do you deal with environments that are hostile to quality change efforts?