Answer Posted / vicky
it depends on size of block/brick
for 1 cum. of blockwork (1:6) (block size - 300X160X190mm)
you can use thumb rule i.e. 70% bricks & 30% mortar
means u have to take 30% of 1 cum. & adding 15% for wet
mortar means total 0.45 cum. mortar required, then u can
calculate the cement = 0.45/(1+6) = 0.064 cum.= 1.83 bags.
same as for brickwork
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Define What is the tensile strength of wood?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
What is Curtailing of R/F
List out some of the checking’s, done at the completion of construction?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
can i get hindi version of is codes based on civil engineering?
What are the types of slump?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
how to calculate steel for slab or footings?
How do you calculate load bearing capacity of a waffle slab?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
I need to constructive work in amaraj batteries