Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the defination of electrical engineer.

Answer Posted / ramendra shukla

A engineer who knows the theory,proper funtioning ,proper
monitoring,of all related equipment as well as the the
profit optimization &insuringing the higher efficiency of
equipment,as well as ensuring safty,precaution,environment
etc is know as electrical engg.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Cb closed condition if there is a tcs fail whether cb will trip or not

1837


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

2823


Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?

1369


what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....

1952


what is the carona effects meaning in HT line transmmission system

2022


what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?

1976


features of hbc fuses

2427


surge tank, hrc fuse, earthing transformer, firm power objective type

1641


If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines

1641


Difference between RCCB, RCBO and ELMCB.

4095


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1822


Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.

1762


Draw the line diagram of diffretial relay connected to transformer?

2443


Why the standard of ambient teperature mentioned as 40 degree celcius in machines.

1979


limitation of conductor height on ground when we consider EMC

2058