17. What is the thing that can disappoint you while working
for a certain employer?
Answer Posted / indresh
No Clear Goals, KRA.
No support from Manager for self developement.
No clarity on scope of work.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What are the advantages of cad?
how can we calculate steel value, depending on load
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
silt%= silt volume/ silt+sand volume is this right?
What is meant by cad?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Define angular dimension?
What is rolling stock
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How foundation is designed, Column design and beam design
What is portland cement
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
what is the formula to find the diagonal shape stirrups?
What is the significance of cost estimate knowledge for an architect?