Answer Posted / ramendra shukla
At the time of abnormal condition,testing or Maintenance
we can put our UPS as on Mannual By-pass mode.
it can also happens when By pass switch or auto control
operation has been failed.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define conversion efficiency of a power amplifier.
What is the diff. between single compression and double compression gland
What is the power factor of an alternator at no load?
As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?
How to Calculate the Fault Level of Electrical Installation
how can i find cable size from current rating?
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
how generator load test is conducted?what are the steps?
What is dc current source?
I am about to write exam in RRB bangalore for the post of section engineer.please provide me with previous exam questions
Meaning of ingrace protection for motor.for ex IPXY
what is the difference between pvc & fiber glass cables
What is earth?
How to set the relay,,??
IN 1000kva transformer where the oil and winding temperature sensors is connected