what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
Answer Posted / prakash kale
for 1m3 conctre --
Take a 52% added dry surface of concrete
1+.52 = 1.52
i.e.
For 1.52 cu.m. concrete
Then
1.52/1+2+4=1.52/7
=.21714
=.22
so.22/.0354 =6.2 bags(1 bag = .0354 cu.m cement)
6.2 bags/cu.m in 1:2:4
Sand--
.22 x 2 =.44 cu.m.
| Is This Answer Correct ? | 118 Yes | 13 No |
Post New Answer View All Answers
what is right & short method of measurement of slab&beam
What are the types of slump?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
why is M30 grade Concrete use for Foothing & Column M50
what is the max. area can we apply the plate load test ?
What are the different types of runners?
What is the exception critarea of cube?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How do you prepare Material Recovery Statement for deduction from contractors bills?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
The foundations are placed below ground level, to increase?
I have an span length 16 ft c/c
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar