what are the costing parameter ?

Answer Posted / balarama boddeti

Hi,

The costing Parameters are the following

Work center : Activity types and the formulaes,cost center

Routing : the time ,activity types

In Production order dependent parameters we are defining
the Variant ,result analysis key,settlement profile

In the controlling i.e in KP 26 we will be defining the
rates per hour depending on the rates it will reflect the
cost caluculating from the routing..

Balaram

Is This Answer Correct ?    22 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can't one material be assigned to more than one operation in a routing?

631


What is the uses of production scheduling profile and what the configure have you done current project

1690


What are some important tables used in pp (production planning)?

608


What is 'capacity planning'?

558


How is the processing time calculated in a wc when both labor, machine categories exist?

672






What are sequence, parallel, overlapping, splitting and where can we assign these

1545


How system calculate the actual cost?

1294


What is Schedule Margin key. How floats works in scheduling?

2495


Mention how mrp (material requirement planning) types are classified?

688


What is the use of plm (product lifecycle management) in sap pp?

613


You want to insert an inspection check point at the end of an operation. How would you do that?

636


Different types of consumption based planning.

2120


Explain what is sap pp?

722


What is opening period?

639


How to create opbject dependencies in a bom for a configurable material?

722