what are the costing parameter ?
Answer Posted / balarama boddeti
Hi,
The costing Parameters are the following
Work center : Activity types and the formulaes,cost center
Routing : the time ,activity types
In Production order dependent parameters we are defining
the Variant ,result analysis key,settlement profile
In the controlling i.e in KP 26 we will be defining the
rates per hour depending on the rates it will reflect the
cost caluculating from the routing..
Balaram
Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
Can't one material be assigned to more than one operation in a routing?
What is the uses of production scheduling profile and what the configure have you done current project
What are some important tables used in pp (production planning)?
What is 'capacity planning'?
How is the processing time calculated in a wc when both labor, machine categories exist?
What are sequence, parallel, overlapping, splitting and where can we assign these
How system calculate the actual cost?
What is Schedule Margin key. How floats works in scheduling?
Mention how mrp (material requirement planning) types are classified?
What is the use of plm (product lifecycle management) in sap pp?
You want to insert an inspection check point at the end of an operation. How would you do that?
Different types of consumption based planning.
Explain what is sap pp?
What is opening period?
How to create opbject dependencies in a bom for a configurable material?