What the approval that owner will give to contractor during
construction project period? What will the affect on project
if delays due approvals?
Answer Posted / mayank jain
1.economically losses
2.it is depend on site condition
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Which Types Of Bricks ?
IS code for grade of concrete for bamboo lintel????
explain the advantages of total stasion
What is the Maximum %age of Steel in columns and beams ?
What is the tensile strength of wood?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how much required strength of cement concrete bricks(size 230x115x75mm)
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How is the strength of cement measured?
How much quantity water should be placed in one cubic meter area?
How foundation is designed, Column design and beam design
What is the difference between routing maintenance and major maintenance in school facilities?
Define What glue is least sticky?
2nd and 4rt angle elevation used in which country ?