what is the density of compacted earth and jamuna sand
Answer Posted / pramod k singh
1800kg/cum
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Forces in a Shear Wall are in plane or out of plane ?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What is c.g.i sheet which used for roof??
How do You Maintain a structure after getting cube test of low strength.
what pressure the NP2 class RCC pipe can sustain?
what is tension footing?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
yasser arfatcompleted his degree in civil from which university
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
material used for mendrel use to bend epoxy coated rebar
How to calculate brick work quantity?? Block work quantity??
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.