why do you desire to change from your current position?
Answer Posted / suresh
due to my experience i welcome my career risk or development
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
types of survey and levelling instrument ?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
In reclamation works what are the importance of geotextiles and sand?
1:4:8 pcc calculation 591 cu.ft
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What is meaning of FREE STANDING STAIRCASE ?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
why demand factor less then 1 ?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How many axes do cartesian coordinate system has?