Answer Posted / abhinab
the following procedure by the change management
1.use the transaction code CC01 for making a change
management no
2.now remember the change no
3.then,change the bom by transaction code CS02
4.enter the change no & edit the bom as per requirement
5.save
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What happens to plan after it has been converted into production order?
Integration between PP and SD module.
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
Mention what are the t-codes for creating, changing and summarizing bom?
How to move to the realization phase?
Explain In-process inspection.
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Explain different inspection type you used .
What does the use of ms70 followed by mcec get you?
How do you do capacity planning ?
Special Procurement type 40 – proc. form alt. plant
What is MRP Area or How can I excluede one storage location stock from MRP?
What happens to planned after it has been converted into production order ?
What is Inspection Points?
In sap-pp what are the costing parameters?