Describe the change process for material BOMs. Include
release procedure/status, notifications, responsibilities,
authorizations, involved systems, engineering change
management,revision levels, synchronization with current
production orders, other.
Answer Posted / bishnu
the following procedure by the change management
1.use the transaction code CC01 for making a change
management no
2.now remember the change no
3.then,change the bom by transaction code CS02
4.enter the change no & edit the bom as per requirement
5.save
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is the difference between pp and pp-pi? Which one is better and how ?
SPRO path for order, confirmation or requirement class.
What is phantom item & sub contracting
How to create prt master records?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is MRO area & MRP group & some difference
What is the data you give in SOP
Define ‘bom group’?
What is Planning time Fence?
What is activity type and how it works in costing?
List out the basic procedure for dispatching operations in capacity leveling?
Explain DMR.
Where have we to specify the teardown time in one operation?
Explain the mrp list and their uses.
what is std info set? where it is used?