Describe the change process for material BOMs. Include
release procedure/status, notifications, responsibilities,
authorizations, involved systems, engineering change
management,revision levels, synchronization with current
production orders, other.
Answer Posted / bishnu
the following procedure by the change management
1.use the transaction code CC01 for making a change
management no
2.now remember the change no
3.then,change the bom by transaction code CS02
4.enter the change no & edit the bom as per requirement
5.save
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is meant by slab?
What parameters you maintain in “plant parameters” in configuration?
What is MRP Profile and MRP Group?
Tell some standard order types and what configure done for current project
What is planning horizon?
Why and how you calculate WIP?
What is a ‘work center’ in pp?
What is a 'product hierarchy'?
What is the t-code for changing production order and to display production order?
What does the use of ms70 followed by mcec get you?
Tell one biggest task for you
Differentiate ‘variant bom’ from ‘multiple bom’?
Mention what is the t-code for changing production order and to display production order?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?