Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

22kV HT incoming should be 3 phase or 4 phase? why is it
not 4 phase?

Answer Posted / krishna

To the best of my knowledge, I came across with only 3 phase
system but there is such 4 phase system.
But I think you were talking about 3-Phase 4-wire system.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it possible to measure the voltage of a battery from a single terminal?

1667


What is bridge rectifier and explain with details

1869


Which cable is use for rtcc control panel

1714


could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com

2028


Is there any relevant technique to produce power from light and heat energy of the sun simultaneosly from same rays of light?

1824


what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct

1783


What is the difference between electronic regulator and ordinary electrical rheostat regulator for fans?

1049


If 100 KAV USP dedicated earth got disconnect / Cut. What will happen at load.

1896


Define the overload capacity of the motor?

1996


what is solkor relay and which condition it will act?

3296


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2769


What will be the diameter of pipe between conservation tank and transformer

1856


DC transmission

2011


completed BE & done apprentice at tneb & having experience 6 years. want to get c license. will apprentiship & BE be helpful for getting c license. will i get any preference by showing this?

1616


lorteny method

1943