Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

all engineering filed in which branch mother branch

Answer Posted / akash dubey

CIVIL ENGG AND TO SOME ASPECTS MECHANICAL ALSO

Is This Answer Correct ?    5 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

IS code for Rolling Margin of steel

2407


How much cement and water required for cement selery????

1867


Consumption of Binding wire for fixing of cover block in vertical surface

1468


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1886


Can we use the flyash bricks in brick bat coba?

1482


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1612


what isload waring calculation

2317


How to find permissible diagonal tensile stress in reinforced brick work

2469


TELL ME THE EQUATION FOR OGEE SPILLWAY

2541


What is labor and material payment bond?

1107


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1563


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2141


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2395


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2114


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1951