Difference between P.C.C and R.C.C?
Answer Posted / parminder singh
P.C.C. stands for PLAIN CEMENT CONCRETE
and
R.C.C. stands for REINFORCED CEMENT CONCRETE
| Is This Answer Correct ? | 347 Yes | 51 No |
Post New Answer View All Answers
what is constat for brickwork
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
What is the standard volume of pharma in cub ft
what are the duties of Site Engineer in work site?
What are the uses of layer?
How to marking the building
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)