I have a 600VA UPS for computer only. It holds for
20minutes only.
1. Can it be upgraded for longer period.?
2. Can it be used for one ceiling fan and a tube light? If
yes, how to upgrade?
Answer Posted / zaighum ali
I agree with Answer # 4, but in addition i would like to
suggest to add more batteries in series to extend the backup
period.
thanks
Is This Answer Correct ? | 3 Yes | 12 No |
Post New Answer View All Answers
What are your future plans for the company if permanently employed?
How many VSC based HVDC are there in India and the world
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
What is turn ratio of a transformer?
What is a Phase shift meter? Where can I get one?
State ohm’s law?
1))why we run three phase or three different circuit from a single conduit 2)) why not two circuit of different phase run in same conduit?? and why we run same three cicuit of same phae run in single conduit??
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?
how we find transformer capacity by ohm
what is x'mer ,isolation x'mer & yltra-isolation x'mer?????
What is self exciting?
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice
What are reasond for high wattage in single phase induction motors
What is Percentage impedence of a transformer? why it is expressed at a percentage? what is the importance of percentage impedence in case of a transformer?
slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock