How does system knows condition type weather its PR00,K004
and MWST .where the system Identifies ?
Answer Posted / subha
Hi Rajiv
Plese do kindly checj sir the t- code vov8 is given for
sals doc and the question realtes to pricing proccedure
There are 2 typs of doing it
1. GO TO VOK0 THERE IN PRICING DETERMINATION YOU HAVE
THESE PROO; MWSTR;k004 and ticks in check box tell us about
theconsdtion type you ahve takes in account
THE OTHER WAY IS AS TOLD BY KARUNAKAR BY CHECKING THE
CONDTIONTYPE V/06
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In Third Party sale process, I am getting an error- in MIRO(Error No. M8889-A/c 893010 has been set as not relevant for Tax, but when I want to change the Account Assignment in ME21 it is taking only G/L A/C 893010 and refusing all other G/L A/C's by giving 2 errors. They are ME045-G/L A/c 39010 cannot be used(please correct)and ME038-No direct posting can be made to G/L A/C 34000. Experts please share your knowledge to solve this problem. Warm Regards.
Where do we can find pricing procedure indicator in sd ?
List out the five features you can control for the sale document type?
What happens after Post Goods Issue?
Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?
Kindly pls give me brief explanation about SAP SD CIN to under stand the basics & not give the entire configuration part it would be higly appreciated if some one help me at the earliest, regards, Srinu
What is information structures? What are the basic types of information it (information structure) comprises of?
i faced one question. when new configuration we do what is the logic behind there?
Copying is not possible. because an entry is missing in Table TVCPL: TA TAN Message No. VL473
Hi Team, this question is related to 3rd party. customer is given order for 20 materials and vendor delivered to customer only 10 material . As per my knowledge vendor invoice will be for 10 material and customer invoice will be for 10 material but my question is how billing quantity will change in sales order against which we have need to create customer invoice for 10 material only. what configuration we need to do for update sales order quantity for order related billing for customer. how vendor will deliver rest 10 material to close this order? could you please share your input with screen shot. Thanks in Advance.
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
What is workflow? Name the person who can assist you while configuring a workflow for a system.
What are the different lists in sap sd. Explain and give examples.
How many sales document types?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling