Answer Posted / bala
1.you can see clear view of slab and intermediate column
joint after de shuttering, it is the right place to explain
punching shear, you know how the slab self load acts,
towards the gravity (downwards) at the same time the column
located below the slab holds and punch upward this is where
the puching shear occurs(the surrounding small area of slab
around the column)that's y u can see top and bottom cross
rods arround that junction.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
specifications of fe500 steel
how can we calculate steel value, depending on load
Did any of the egyptian pyramids ever fall down?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what is the anchorage length of reinforcement.
for pretensioning which will yield first and same for post tensioning?
What is the meaning of a blue land surveyors flag?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Which type of plywood & sizes using in construction projects ?
What is quantity of cement and sand required for 2000sqft of tiling?
What is reinforced concrete?
How to fix toll charge for a particular vehicle at toll booths in a highway?
When column of building is abutting the boundary line,then suitable footing advised is
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?