Answer Posted / sjtbehera
Look beams are the dstributing load to the column. it
united the columns. it take loads of wall, slab and
distribute to column.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
How to get MEP technical,instaaltion & testing data for interview?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
how to determine H- zone in a column? where it will occur?
brickwork labour rate per cum ?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How will be cutting in timber plate size 600*400 column size
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Write short note on construction programme for pile foundation.
How to calculate quantity of plum masonry in 1:3:7
How to calculate the quantity of ingredients of M20 grade concrete?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What are the advantages and disadvantages of lead products in construction?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?