how to calculate the steel quantity for columns and beams
Answer Posted / ravi kiran nelapati
steel quantity = 1% of concrete quantity
(in general for calculation of quantity)
| Is This Answer Correct ? | 60 Yes | 45 No |
Post New Answer View All Answers
Permissible wastage of cement as per IS code ? In which IS code I get it?
what could be the production cost of 1 cum of concrete by CP30 plant
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Which prize is the alternative to the NOVEL Prize?
what is that one cub metre plaster in cemant and fine sand
What is GSB gradation
How is improve my knowledge in construction industries....
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
How can I make justification between using concrete grade c35 compare c37?
What is meant by scaffolding coefficient?
Are you ready to relocate with your immediate family to United States as a new employee?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3