What is The meaning Of Auto cad And Also Define What Is
Drawing According To You
Answer Posted / karthi.j
The word Auto is denotes nothing AutoCAD is a CAD
(Computer Aided Design or Computer Aided
Drafting)
It is used for software application for 2D and 3D design and
drafting, developed and sold by Autodesk, Inc, the Autodesks
founder was John walker . Initially
released in late 1982, AutoCAD was one of the first CAD
programs to run on personal computers, and notably the IBM
PC. Most CAD software at the time ran on graphics terminals
connected to mainframe computers or mini-computers.
| Is This Answer Correct ? | 31 Yes | 8 No |
Post New Answer View All Answers
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Why should you show Client/Engineer activities clearly on the project plan?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is oneside mat. And explain
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is the compressive strength of fly ash bricks?
difference between fc and fc'?
What is critical path method (c.p.m)?
How do you calculate the unit weight of concrete?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
what is right & short method of measurement of slab&beam
why development length = 50D . why not 100D