How many straight through joint is permissible in single
core 33kv XLPE cable for a length of 985 mtr.
Answer Posted / sridhar
this is not compulsory to have a joint in the cable length
of 985mtr. we can plan of avoiding joint by procuring the
cable drum in single length. Advantages is you can avoid
the joint & dis advantages is handling such a heavy cable
drum due to weight & special order to be placed on cable
manufacturer.
2. by having straight through joint in the cable, we have
to ensure that the joints are done at a proper place to
avoid any damage to the cables & to put the
identification / route marker to be placed if the cables
are going to be laid in u/g.
note:- As per the standard cable manufacturer is concern ,
the max. cable length in a drum will be 250mtrs. for this
we have to fix min 4nos. of straight through joints. By
this we are adding cost to the cables + straight through
joints.
by procuring through 1st method we can avoid the above said
parameters.
Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
What do you mean by lighting transformer?
what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.
what are the analog quality input for protection function?what are minimum reqiments?
what is the meaning of neutral displacement ???
what is the value of combined earthing in general electrical circiut?
why are distributed windings generally used in alternators?
What is the control action?
What is electrical cable termination
i had aplied Hindustan Petroleum corporation limited for the post of maintenance technician -Electrical,i want model questions,if anybody have please send it or please advice?
sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
What are the Return ( Monthly / quarterly/ Annual submitted to Electical Inspector for an establishment (Factory in Maharashtra-- Small scale category having seperate HT line of 22KV ) as per Maharashtra Electricity Act
When lag/lead/lag-lead compensation is employed?
How to test lightning Arrester?