what is the difference between v & W model? please explain
in detail
Answer Posted / amit verma
Waterfall is a Linear Model in which after completion of
each phase next phase will come in linear order like
Requirement,Design,Analysis,Development,Testing n so on.
Main drawback in this,after completion of one phase next
phase will start.So,cause of the issue will detect later
then cost will increase.That is the main prob. with W Model.
While V Model is a Non Linear model in which phases are not
in linear order.In V Model on the left hand side there is
Verfication phase and on right hand side there is
validation.Both activites of Verification and Validation
phases are goings on simultaneusly.
| Is This Answer Correct ? | 7 Yes | 9 No |
Post New Answer View All Answers
what is the common in all s.o.p (standaed operating procedure)?
What is mean by multi-threading testing?
what are the risks and contingencies u had in ur project?
In cycle 1 we have 100 test cases out of which 95 test cases are PASS and 5 test cases are FAIL. So in cycle 2 how many test cases performed as a part of regression testing?
What is a test scenario?
What are the advantages of black box testing?
A form has four mandatory fields to be entered before you submit. How many numbers of test cases are required to verify this? And what are they?
What is desk checking and control flow analysis
What is test driver and test stub?
What is difference between Bug resolution meeting & Bug Review Committee? Who are participants?
Can you explain a pair-wise defect?
What is defect removable efficiency?
What r the domain for pharma, interview if they ask about phrma application, what need to tell, is there anybody have screens or any information please tell me and if have URL let me know please.
can anyone tell me the questions that can be posed in an interview for a 5 year experienced person in manual testing
Write positive and negative test cases for forgot password?