what is the shuttering normal clear cover for footings,
walls, beams & columnms
Answer Posted / naasir
it depends on different conditions but normally
for columns 20mm
for footings 75mm
for beams 50mm
| Is This Answer Correct ? | 4 Yes | 20 No |
Post New Answer View All Answers
How do You Maintain a structure after getting cube test of low strength.
What is the strength of 1:6:12 mix?
what are the changes in concrete pour height as per IS 456, 2009?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how to find hardness of water?why it should be determined?
what is E
What is rate of concrete surface rendering work per sqm
how we can find sieve #4 is 4.75mm?
"Gates of the dams are generally designed of curved shape". Why?
what is w/c ratio in dry lean concrete for m10 mix design
What is the difference between built area and super built up area?
What is type failure of road surface? how to repair the failure of road surface?
what is Brick crushing strength(PSI)?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How to calculate brick work quantity?? Block work quantity??