Answer Posted / chilukuri
integration testing is performed by developers and also test
engineers.
developers will perform the integration testing during the
application construction time is called low level
integration testing.
test engineers also perform the integration testing after
system testing inorder to verify the the interface with
different applications is called high level integration testing.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
How do you go about testing a project?
1.What types of documents would you need for QA, QC, and Testing?
Why is it impossible to test a program completely?
Explain briefly your project.
can anyone tell me the questions that can be posed in an interview for a 5 year experienced person in manual testing
Can you explain tpa analysis?
need answer interviewer will ask me about all project which i mention in resume or presently i'm working??please reply tomorrow is my interview
what are questions asked in TCS for database tester (sqlserver)?ay idea
What do we need to build a quality QC team ? a QC manager with all junior QCs or a QC manager with all senior QCs?
What is severity and priority of bug? Give some example.
How the application is launched to the production environment?
If anybody from banglore having the real time exp in manual testing with 3+ yrs exp and looking for change send your profile to vinodhanandhan@gmail.com
What is sanity?
What are the benefits of requirement traceability?
i have source and target having same data structure 500 fields and one lacks records. how to validate data. write 5 scenarios.