Answer Posted / ahmed mahmoud
PLC = Programable Logic Control
DCS = Distrbuted Control System
SCADA = Supervisory Control And Data Acquisition
| Is This Answer Correct ? | 23 Yes | 2 No |
Post New Answer View All Answers
What is the purpose of stablization resistor in high impedance bus bar protection
WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?
How LT megger works ?
Is vtg is controlled by the resistor? if else how much?
How is magnetic leakage reduced?
i am completed diploma in ece,and working in ht and lt lines.so is elligible diploma in ece for get electrical C Licence?plse give ur opinion?
What is the difference between rated and per unit in transformer?
being an electrical engineer why you wanna come into software i have an very good academics what answer i have to give
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?
WHAT CAUSED THRESHOLD VOLTAGE TO EXIST?
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
What are the applications of the electric motors?