Answer Posted / gurusharan
It is voids present in the material.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how many type of admixtures for water stored structure?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
What is Curtailing of R/F
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What are the skills required to become an architect?
Define absolute co-ordinates?
What is the substitute of Mastic Asphalt?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what is conrete grade ,how are depent on concrete grad and size of concrete?
Which is the best book for building construction?