Answer Posted / pradeep
Tremie concrete is placing of concrete by tremie pipe for
piling work where concrete compaction done by movement of
pipes up and down. Slump is very high for such concrete.
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
Why does the pressure increase under soil?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
How to find the cuplock pipe qty in staging for Minor bridge?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
Dear Sir What is the Contraction joint for base Slab
may i know the detailed description of cutting length
Slab quantity
what does the grad of cement shows (denotes)?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
how to convert sand in Cft to Kgs
What is the difference between 53 grade and 43 grade cement
Why are the bolts that hold steel rails together in oval holes?
In a concrete grade C35A, C & A stands for what and equalent cube strength?