what are co-efficient for jacks, acro spans and runners for
slabs per sft?
Answer Posted / pradeep
there is wide range of coeffiecient depends on aspect ratio
of slab, span size, thickness of slab, use of steel plate
of plywood, condition of acrow span and jacks, opening in
slabs, projection in slabs, number of beams and its size
crossing slabs etc. You have to calculate for each building
for one slab than use for typical slab.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
Test procedure of fly ash bricks as per code ?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
Slump Values for works?
During reclamation how can the occurrence of mud waves can be rectified?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
how calculate the bearing from two coordinates?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what is the most suitable foundation when construct a bird watching tower in a marshy land
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
significance of specific surface area of particles?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
What is the zero value in quantity surveying
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????