WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP
Answer Posted / manoj
Development length is provided for ancorage stress or to
provide anchorage length (bonding stress)of steel in
concrete.steel bars are provided as per failure pattern of
the structure if steel is not present to take tension.At
ends /supports due to fixity negative moment is developed
which is resisted my steel at top.
the top extra length should exceed the inflection point
between negative and posetive moment.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
Can inverted beams used in pipes during construction?
How to construct a water sump in a rocky soil?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
explain the advantages of total stasion
residential projects,structural.
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
Are you ready to relocate with your immediate family to United States as a new employee?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
how to estimate material requirement for an area of house in square feet?