what is requirement class and requirement type? and what is
the difference between them
Answer Posted / rajiv trivedi
Requrement Class : In ATP it is used. It contains all
control feature for planning such as relevance for
planning, req. planning strategy and requirement
consumption strategy. In addition, it is specified at a
global level whether an availability check is to take place
for the material in Sales & Distribution documents on the
basis of ATP quantity and whether requirements are to be
passed on. A finer degree of control can be obtained for
the sales document using th schedule line category.
Replenishment lead-time is only included in the check
performed on the basis of the ATP quantity.
SPRO -Production-Production Planning- Demand Management -
Planned Independent Requirements - Requirements
Types/Requirements Classes
Requirement type 41 and class also 41
is generally used.
The requirements type and, eventually, requirements class
are determined in the strategy group tcode MM02 - MRP 3
view under planning.
Requirement Type: Various requirement types are identified
by thier requirement type. This refers to the requirements
class and its control features which is assigned to
requirement class.
It is a factor in condition technique that restricts access
to a condition table. the system only access a condition
table to determine the connected/assigned requirement class
or price if the requirement specified has been met.
Trust this clarify. Please read/learn on ATP concept so you
will get clear idea
rajiv2856@yahoo.ca
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Kindly pls give me brief explanation about SAP SD CIN to under stand the basics & not give the entire configuration part it would be higly appreciated if some one help me at the earliest, regards, Srinu
what is the use of billing report
How to create the source and target database connections in the server manager?
How does SAP get to know whether the material is available or not? how does it determine MAD? What exactly happens in sending TOR?
How do I change this?
What are different sales document in sap system? How to create a sales document?
how to and where to maintain copy controls
Give examples for standard output types in sd.
how we will configure export sales in sd (respect to plants assign and sales process)?
Hi, wrong work item in universal work list.what could be the reason and where to check? can any body guide me thanks
Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?
Hi, I have advance payment scenario where customer want advance payment cannot be used against another sales order and against any credit limit. Let me put one example. Customer X is having credit limit of 1000 USD, if my client is received customized product order then he will take advance for this special order but customer X is already enjoying credit limit of 1000 USD. In this scenario my client wants advance payment received cannot use against any sales order and against any credit limit. If I will post advance payment in F-29 then customer credit exposure will decrease against credit limit in FD32 which will affect normal sales order credit limit. Here customer does not want to utilize advance payment against credit limit of customer which is use for normal sales order. Please suggest
Does sap transportation management require the use of sap event management? : transportation management
How can a company's structure represent by defining and assigning corporate structure elements in r/3 system and what is the purpose of doing that?
What are the various configuration methods available in stms? : transportation management