Which of the folowing is not correct
a. (x+y)'=x'.y' b. (x'+y')'=x.y
c. (x'.y')'=x+y d. (x'+y')'=x'.y'
Answer Posted / karthikeyan
As per Boolean function the answer is (x'+y')=x'.y'
This is not correct in above series.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
maths
Three cards are drawn at random from an ordinary pack of cards. Find the probability that they will consist of a king, a queen and an ace.
inept : clever :: languid :
the decimal number was given.it was converted to other system.they asked to identify the system.i.e. octal,hexadecimal.
All people use a bus paid equalty. 40 seats in the bus.Bus charge is Rs. 70.37. How many seats we left unfilled?
The area of the maximum size of the circle described from the 10 square inch square?
In a helpful book on the indexing and searching of text-based electronic files, a well-respected computer scientist differentiated _____________________ search efficiently using augmented inverted indices. latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, with vector space models, which can between latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, and vector space models, which can between latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, with vector space models, which can latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, and vector space models, which can
In which year will the 21st century begin?
If the bus travels with 8 tyres(6 tyres running),travels a distance of 16000 km how much is the distance sustained by each tyre.
PROCESS FLOW IN LOGISTICS
One guy (some name) has Rs. 100/- in hand. He has to buy 100 balls. One football costs Rs. 15/, One Cricket ball costs Re. 1/- and one table tennis ball costs Rs. 0.25 He spend the whole Rs. 100/- to buy the balls. How many of each balls he bought?
What is the error in the given sequence. 2,3 6,7 14,15 29,46.
Please provide me rs aggarwal verbal reasoning book link pleeeeeeeez
The rectangle box with square base is open at the top. The maximum volume of the box made from 1200 m2 tin,in m3 is?
Ramesh working alone on a job takes 12 days more than what he would have taken if Suresh had worked along with him while Suresh working alone on the same job takes 27 days more than what he would have taken if Ramesh had worked along with him. Find the time that both of them would take together to do the job.