Answer Posted / ramprasad.s
Hi
1. Will Meet Team Lead everday .
2. Will Meet Project Manager once in a week
(In a Meeting).
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Do submit teststrategy to customer if yes at what time
test measurment techniques
What is the Diff between Code Walkthrough & Code Review? What is the diff between walkthrough and inspection? What is meant by GUI Testing?
Risk Analysis a) 2 step, b)3 step, c) 4 step, d) 6 step
How will you prepare traceability matrix if there is no Business Doc and Functional Doc?
What is bug severity?
Hi All. How can we write negative test cases for Logout Operation ? Please place the answer with a few details and if possible add some related object properties. "A tester exposes his/her ability not only by words he/she also proof it by work"
Can you explain v model in manual testing?
plz tell me the difference b/w PB/MF based appl.with examples. Thanks
What is back to back testing?
What is an mr?
Difference between Stakeholder and Relevant Stakeholder?
What is smoke test?
Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks
What is the difference between load testing and performace testing?