material calculations for I st coatplastering 16mm CM
(1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime
stone masonry CM(1:6)

Answer Posted / d k panchal

2400

Is This Answer Correct ?    2 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

1858


What is the average density of soil?

687


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1972


Explain what is 1/8 on the architect ruler denotes?

680


Explain the different types of building contracts?

669






What is an ortho mode?

730


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1332


Types of column foundation and how to calculate its steel quantity.

1451


mix design procedure for 1:6 cement mortar

1756


Define What is the force exerted by the Tacoma narrows bridge?

725


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1351


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2332


how pumping of concrete effects the quantity of material used in it?

1301


how many digree of freedom in four bar chain

1927


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1670