Answer Posted / dushyant bansal
Generally In a prestressed COncrete Girder Stresing is done
using multi pull jacks that can pull all the cables in a
seething pipe. Also jacks are provided on both the ends of
cables and stress is applied to it until it reaches the
specified limit.
Elongation of the cables is also measured to cross check
the tension in the cables.
Is This Answer Correct ? | 58 Yes | 7 No |
Post New Answer View All Answers
Please design 12.5m long dubbly beam
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
The foundations are placed below ground level, to increase?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
what is the exact dia of 8swg and 10swg gabion wire
How did street originate in the plumbing term street ell?
Why do you want to work here
What is geopolymer based concrete?
What ingredients with% found in ppc cement??
Advantage of Aluminum form work in terms of activities can be skip and cost too
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Which are the top apps for you civil engineering?
what is the difference between natural draught cooling tower and induced draught cooling tower
How many types of slabs are there & how to design it?