methode of psc girder stressing

Answer Posted / dushyant bansal

Generally In a prestressed COncrete Girder Stresing is done
using multi pull jacks that can pull all the cables in a
seething pipe. Also jacks are provided on both the ends of
cables and stress is applied to it until it reaches the
specified limit.
Elongation of the cables is also measured to cross check
the tension in the cables.

Is This Answer Correct ?    58 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please design 12.5m long dubbly beam

1481


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1734


The foundations are placed below ground level, to increase?

790


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1390


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7892






what is the exact dia of 8swg and 10swg gabion wire

1844


How did street originate in the plumbing term street ell?

634


Why do you want to work here

1849


What is geopolymer based concrete?

2158


What ingredients with% found in ppc cement??

1599


Advantage of Aluminum form work in terms of activities can be skip and cost too

569


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1665


Which are the top apps for you civil engineering?

686


what is the difference between natural draught cooling tower and induced draught cooling tower

1829


How many types of slabs are there & how to design it?

775