Answer Posted / dushyant bansal
Generally In a prestressed COncrete Girder Stresing is done
using multi pull jacks that can pull all the cables in a
seething pipe. Also jacks are provided on both the ends of
cables and stress is applied to it until it reaches the
specified limit.
Elongation of the cables is also measured to cross check
the tension in the cables.
| Is This Answer Correct ? | 58 Yes | 7 No |
Post New Answer View All Answers
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What is specific gravity???
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
why we create short columns under grade slab?
What is the snap size in civil and how can we create it?
Explain different types of rcc pipes.
What are the composition of a landfill?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how to calculate the scour depth
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
why & what is perchatage we are using fly ash in concrete?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit