How we maintain one material at atime for two company codes?
Answer Posted / yogesh
we have to extend the material from one plant to another
plant
Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
To extend material one plants to another plant what are the configuration you done in your project?
what are the two places where you need to configure cin (country version india)?
What is the difference between make-to-order production with and without assembly processing?
Name the necessary steps to setup a route?
How have you used MASS tool in your last project, and to upgrade what data?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration?.
what is solution database and how to intigrate the service order with solution database? what is purpose of t.code IS31? wht is the service manager? waiting for feedback
Which organizational element is central in shipping? Give a definition of it.
At present we have the STATIC credit check, for only one customer we want DYNAMIC credit check from next month. no need to go for configuration ? only should go for master data for that only customer.
What is handling unit in sap?
Did you work on Transportation,what are the major settings for the transportation ?
What is the parallel and local currency in sap?
How can we configure Input Tax in SD?
Explain how ‘human elements’ are organized in sap sd
Give examples for standard output types in sd.