hi ,
can anybody help me about the following doubt......
what is the difference between clear cover, cover and
nominal cover to reinforcement ?
Answer Posted / kishore bangaru
COVER IS THE DISTENCE BETWEEN CENTER OF THE REINFORCEMENT
TO BOTTOM OF SLAB OR BEAM. CLEAR COVER MEANS THE DISTENC
BETWEEN BOTTOM OF THE REINFORCEMENT TO BOTTOM OF SLAB OR
BEAM. AS PER SPECIFICATION THE MINIMUM COVER IS CALLED
NOMINAL COVER IT IS DEPENDS ON STRUCTURAL DESIGN.
| Is This Answer Correct ? | 23 Yes | 2 No |
Post New Answer View All Answers
what are the changes in concrete pour height as per IS 456, 2009?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Define absolute co-ordinates?
how to control PQI (Project Quality Index)
why do we provide haunches in rcc box or underpasses?
why & what is perchatage we are using fly ash in concrete?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
How much cement and sand required for 9"brick wall per square metre
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Calculation of Pier Cap with tapper area?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
what could be the production cost of 1 cum of concrete by CP30 plant