how you confirm the hard stratum for driven cat in situ
pile work?
Answer Posted / sachin pawar
to confirm the hard statum for driven cast in situ piles,
check the specific gravity of stone obtained while boring
the piles. it should be between 2.77 to 3.08
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What Are The Different Type Of Slump Test Indications?
Explain the various stages of the project planning process in construction?
Can we apply curing compound on ceiling (slab Bottom)
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
1:4:8 pcc calculation 591 cu.ft
What is the use of mirror command?
How can i display 5 asterisk and another 5 asterisk )?
what energized you to complete your course?
What are the types of slump?
what is hydrostatic paradox?
How we calculate the service time of buildings
How to find beam R/F cutting length
What is the difference between Grade I, II and III of GSB?