how you confirm the hard stratum for driven cat in situ
pile work?
Answer Posted / sachin pawar
to confirm the hard statum for driven cast in situ piles,
check the specific gravity of stone obtained while boring
the piles. it should be between 2.77 to 3.08
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Stringer How many cm goes to landind
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
What is meant by Crystal Concrete?
How much 1 cum of M15, M20 & M25 concrete weigh?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What are the different methods for drawing an arc?
How does a traffic light signal work ?
why we are using stub column..? is it possible to construct steel stub column..?
What are the joints wants to made in masonry where door opening, arches like etc..
How to do rate analysis for concrete work including shuttering work?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What is the cemnent ratio
What will be weight of 0.5mm GI sheet per sq.ft?
What are the advantages of building a dam on the river nile?