how to determine capacitor bank capacity of one plant..
Answer Posted / pichumani
As a thumb rule, 1/3 (30% appx.) of your KVA demand shall
be the KVAR requirement of your plant.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
what is the best transformer oil breakdown voltage?
what is meant by twilight switches 7 where its applicable ?
how to prepare the technical test
'documenˁ
what do you mean by every IC 74 first digit.why are you using this no.why not using another no.
How can we measure earthing resistance test (Earth meggar) of Transformer neutral pit while in live condition?.
what is the difference between b c d curves on mcb
what is the meaning of 5% droop or 7% droop in AVR?
if i am in front of transmission line how to know that current direction without any equipment
If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?
CAN U PLEASE TELL ME SOME G.D TOPICS FOR APGENCO INTERVIEW&G.D
what does a string of resistors in a series will do?
State ohm’s law?
What is polar plot?